| |
Maps |
Note that the maps referenced on this page may still show the previous phases 1 through 4. For MassHighway purposes, phases 2 and 3 were switched, so that all phases now reflect the intended contiguous construction phases (phase 1 starts at the Fairhaven line and ends at Mattapoisett Neck Rd.; phase 2 now continues from there to Depot Street; phase 3 now starts at Depot St. and continues to North St., followed by phase 4, which would reach the Marion town line. Phases 3 and 4 may be served in one construction cycle, and the phase 4 portion depends largely on the Town of Marion's rail trail plans.
|
Regional Maps, including full, proposed Fairhaven
Branch Rail-Trail, from West Wareham to Fairhaven
|
![]() SRPEDD Proposed Fairhaven Branch Rail-Trail (on existing right of way). Click image for larger view (22K), or view the full SRPEDD Regional Bikeways map (344K). |
![]() New Haven Railroad map, SE Mass. portion (30K), from a 1929 timetable. (Courtesy of the New Haven Railroad Historical and Technical Association; Full RR map on their site, 150K) |
||
|
Fairhaven
Map |
| |
Maps |
This page last modified July 18, 2004. Email comments regarding this page to the webmaster.